179D Modeling vs. Certification.
Know each responsibility.

Energy modeling, field inspection and certification work together. Understanding the boundaries between them helps you buy the right scope and avoid an incomplete handoff.

Modeling predicts. Inspection checks. Certification documents.

WorkstreamCore questionTypical output
Energy modelingHow does the proposed building compare with the reference?Documented inputs, assumptions and performance results.
Field verificationDoes the installed property match the information used?Observations and required inspection records.
Qualified certificationDoes the reviewed package satisfy the applicable certification requirements?Certification documentation when requirements are met.

A modeling report alone should not be described as a completed certification package. Equally, a site visit does not replace the modeled comparison. Ask the provider to identify who owns each workstream and what you will receive.

Energy use and energy-cost savings are different measures

A model may report electricity, gas and annual costs. A percentage reduction in one fuel does not automatically equal the qualifying savings calculation. For the traditional modeling pathway, the comparison concerns the applicable systems' annual energy and power costs against the required reference.

See the comparison. An illustrative energy-cost model, not a project result or deduction estimate.
Reference design
100
Proposed design
70

30% lower modeled cost in this illustration.

Savings = (reference cost − proposed cost) ÷ reference cost. Both values must use a consistent basis. Tax qualification requires the applicable calculation rules and documentation.

Use the illustration to understand the arithmetic, not to estimate your deduction. Your project model must establish the inputs, comparison basis and results. IRS overview of the deduction ↗

Plan verification before the handoff

Agree the inspection scope with the certifier before arranging the visit. Confirm who will provide access, which records are needed and how observations will be connected to the model. An equipment photo is easier to interpret when it includes a location and a matching equipment tag.

If the installed system differs from the schedule, make that discrepancy visible. The team then decides whether inputs need to be corrected or additional information obtained. A clean record of the resolution is more valuable than assuming the original drawing remains correct.

Lorhlam prefers a qualifying client-company PE to inspect under our certifier's guidance. If that is not available, site inspection can be separately quoted. See our certification service and responsibilities.

Compare the complete scope, not just the headline price

Request separate lines for modeling, certification, field inspection, travel and additional work. Ask how missing information and design revisions are handled. A bundled quote and a modeling-only quote can look very different even when both are described as a “179D study.”

At Lorhlam, standard-scope modeling starts at $150 per building up to 50,000 sq ft. Certification adds $450 per building. Inspection-related charges are separate. Use the published fee tiers and estimator to understand the starting scope.

Finally, distinguish the engineering fee from the potential tax benefit. Neither a price quote nor an illustrative savings chart establishes the client's entitlement to a deduction.

Source notes

Technical references checked October 10, 2026. Confirm the rules that apply to the specific project.

Your next step

Put your project
in focus.

Share your location, building area and available documentation. We will confirm the scope and fees before work begins.

Discuss Your Project
179D eligibility note

179D eligibility depends on project dates and applicable requirements. The deduction is terminated for property whose construction begins after June 30, 2026. Contact us to assess your project’s engineering scope and eligibility considerations. IRS guidance ↗