LORHLAMENGINEERING, LLC
179D energy modeling services

179D Energy Modeling.
Services across the US.

Lorhlam Engineering provides 179D energy modeling for commercial buildings across the United States. We help engineering firms, designers and project teams turn plans and system schedules into documented proposed and reference-building comparisons.

Discuss a Modeling Project

What is 179D energy modeling?

179D energy modeling is the engineering analysis used in the traditional modeling pathway for the Section 179D commercial building deduction. It compares a proposed-building model with an applicable ASHRAE reference model to evaluate eligible annual energy and power cost savings. It is one part of a broader documentation and certification process.

Lorhlam supports the analysis with building geometry, system inputs and a documented comparison. Our work is designed for engineering firms, designers and project teams that need a defined modeling scope and a clear handoff. DOE technical guidance ↗

Inside the analysis

One building.
Two coordinated models.

A schematic view of the comparison. Select a system to highlight its role.

Reference designApplicable standard and modeling rules
Proposed designDocumented project systems

HVAC and hot water: equipment efficiency, controls and schedules are represented in the analysis.

Compare eligible annual energy and power costsRecord the inputs. Explain the difference.
Schematic only. No project savings or eligibility are represented.

For a closer look at the work behind the report, read how the 179D modeling process works.

What our 179D modeling service includes

A useful model starts with a building that is understood, not just drawn. We organize the geometry, occupancy assumptions and system information before evaluating performance. Missing inputs are identified so your team can resolve them deliberately.

01 / GEOMETRY

Define the building

Develop the 2D plan and thermal zoning, then translate the geometry into eQUEST with orientation, floor areas, doors and windows.

02 / SYSTEMS

Represent the design

Incorporate HVAC and hot water, interior lighting, and envelope information. Record the source of each major input and the assumptions used.

The applicable ASHRAE reference design provides the comparison. The software version and its capabilities must fit the project's reference standard and systems; a software name alone is not a complete methodology. DOE qualified-software list ↗

From plans to performance comparison

  1. GatherConfirm the project dates, location, floor area and drawing revisions.
  2. BuildCoordinate thermal zones, schedules, equipment and envelope inputs.
  3. CompareEvaluate proposed and applicable reference-building energy use and eligible energy costs.
  4. ExplainDocument results, assumptions and unresolved items for the next project decision.
See the comparison. An illustrative energy-cost model, not a project result or deduction estimate.
Reference design
100
Proposed design
70

30% lower modeled cost in this illustration.

Savings = (reference cost − proposed cost) ÷ reference cost. Both values must use a consistent basis. Tax qualification requires the applicable calculation rules and documentation.

eQUEST modeling: confirm the version and scope

Our workflow uses eQUEST geometry to represent the building. DOE lists eQUEST 3.65 among its qualified software versions for the ASHRAE 90.1-2007 reference standard. That listing is not blanket approval for every standard, software release or system configuration.

At the start of an engagement, confirm the applicable reference standard, software version and relevant capabilities. The project dates and technical requirements determine the analysis basis. Consult the current DOE software list rather than assuming a familiar program name is sufficient.

An agreed report you can work with

Your scope defines the final report and supporting analysis. Expect a clear account of the modeled building, the principal inputs, the reference basis and the performance comparison. If inputs are incomplete, the report should distinguish confirmed information from assumptions.

Modeling does not replace the field verification or qualified-individual certification needed for a complete certification engagement. If your team needs those services too, explore 179D certification support.

Before sending files, use the 179D modeling document checklist to organize plans and schedules.

Published modeling fees, defined scope

USD per building, by gross modeled floor area
Floor areaModeling fee
Up to 50,000 sq ft$150
50,001–100,000 sq ft$275
100,001–150,000 sq ft$400
150,001–200,000 sq ft$525
200,001–300,000 sq ft$750
Over 300,000 sq ftCustom quote

These company rates assume standard scope and complete, usable information. Complex systems, additional scenarios or revisions may change the quote. Inspection and certification are excluded. Use the project fee estimator or ask about a portfolio agreement. Our 179D modeling cost guide explains fee examples and the scope factors that can change a quote.

Questions before you start

Can you work from our architectural drawings?

Yes. We review supplied drawings and schedules, confirm the available inputs and identify gaps before agreeing the modeling scope.

Do you guarantee a particular energy saving?

No. Results depend on the actual design, the applicable reference and the documented assumptions. A study can identify whether the modeled performance supports the next step.

What makes a modeling quote comparable?

Compare the building area, systems, included report, revisions, certification scope and inspection responsibilities. The lowest headline fee may cover a different scope.

Your next step

Put your project
in focus.

Share your location, building area and available documentation. We will confirm the scope and fees before work begins.

Discuss Your Project
179D eligibility note

179D eligibility depends on project dates and applicable requirements. The deduction is terminated for property whose construction begins after June 30, 2026. Contact us to assess your project’s engineering scope and eligibility considerations. IRS guidance ↗