LORHLAMENGINEERING, LLC
179D certification services

179D Certification Services.
A documented handoff.

Lorhlam Engineering coordinates 179D certification support for US commercial buildings through a PE-certifier network covering all 50 states. Each engagement defines energy modeling, qualified review and field-inspection responsibilities before work begins.

Discuss Certification

What a certification engagement brings together

A model describes the building using supplied information. A certification engagement adds the verification and qualified review needed to connect that analysis to the installed property. These are related tasks with distinct responsibilities.

01Modeling02Field verification03Qualified review

We review the modeled results, coordinate the inspection requirements and organize the documentation for the certifier. Certification is completed when the applicable requirements are satisfied. Read the modeling versus certification guide for the handoffs in more detail.

Inspection responsibilities, agreed up front

Lorhlam prefers that a qualified PE from the company engaging us conduct the inspection under our certifier's guidance, subject to the applicable qualifications and independence requirements. Our contracting client coordinates site access, permissions and communication with the building owner.

This arrangement keeps project communication with the parties involved in our contract. When the client cannot support the inspection, Lorhlam can separately quote site-inspection services and any required verification.

The qualified individual must meet the relevant jurisdiction's licensing requirements and the applicable independence requirements. A professional title by itself is not sufficient. DOE guidance on qualified individuals ↗

Confirm the proposed inspector and documentation needs before the visit. An organized site record helps the certifier resolve discrepancies between the drawings, model and installed systems.

What to include in the agreed package

  • The energy-modeling report and supporting performance comparison.
  • The inspection scope, observations and records needed for review.
  • Documentation of any discrepancies and how they were resolved.
  • Certification by an appropriately qualified independent individual when requirements are met.

Allocation-letter and Form 7205 drafting support can be separately scoped. Your tax preparer determines the final tax treatment and filing. See the full engineering-services scope.

PE-certifier coverage across all 50 states

Project location matters when selecting the qualified individual. Explore the interactive state coverage map to see our PE-certifier counts, then discuss your project's jurisdiction and requirements with us.

Our published certification add-on is $450 per building plus the modeling fee. For a standard-scope building up to 50,000 sq ft, the combined fee starts at $600 before inspection-related charges. Fees and deliverables are confirmed before work begins.

Questions before you start

Is site inspection included in the $450 fee?

No. Field inspection, travel and additional verification are separately scoped and quoted. The certification add-on covers the agreed certification review and documentation.

Can our own PE perform the inspection?

That is our preferred arrangement when the individual meets the applicable licensing, qualification and independence requirements and follows the certifier’s agreed scope.

Does paying for certification guarantee a deduction?

No. Qualification depends on the project facts and applicable requirements. Certification supports the tax process; payment does not establish eligibility.

Your next step

Put your project
in focus.

Share your location, building area and available documentation. We will confirm the scope and fees before work begins.

Discuss Your Project
179D eligibility note

179D eligibility depends on project dates and applicable requirements. The deduction is terminated for property whose construction begins after June 30, 2026. Contact us to assess your project’s engineering scope and eligibility considerations. IRS guidance ↗