1. Establish the project facts first
Start with a short project cover sheet: building address, building use, gross modeled floor area, construction-start date and placed-in-service date. Include the contracting entity and the person who can answer technical questions. These details keep a modeling request from becoming a collection of disconnected files.
If a date is uncertain, label it as unconfirmed and identify who will verify it. Do not substitute a drawing issue date for a construction or placed-in-service date. Keep the evidence with the project records so the team can review the appropriate requirements.
2. Make the building geometry legible
Send the current architectural floor plans, elevations, sections and a site plan showing orientation. A consistent drawing set is more useful than a larger collection of superseded revisions. Flag additions, separate buildings and areas with different operating conditions.
- Identify floor-to-floor heights and the boundaries of conditioned space.
- Provide window and door sizes, locations and available glazing specifications.
- Identify uses that drive distinct thermal zones, such as offices, storage and assembly spaces.
- Record any difference between the plans and the installed building.
Keep a drawing register with the file name, revision and date. If a sheet is missing, say so. This gives the modeler a clear basis for requesting the right information rather than inferring dimensions from unrelated plans.
3. Connect equipment to the spaces it serves
For HVAC and hot water, provide equipment schedules, system types, capacities, efficiency data and control information. A schedule is most useful when equipment tags can be traced to the zones served. Include available sequences of operation and operating schedules.
For interior lighting, send fixture schedules, layouts, installed wattages and control descriptions. For the envelope, collect wall and roof assemblies, insulation specifications and glazing properties. List the source of each value: a drawing, submittal, equipment label or confirmed project record.
Choose one room. Can another person trace its area, use, operating schedule, serving HVAC system, lighting and exterior construction without asking you? If not, that is a useful gap to resolve before handoff.
4. Agree what happens when information changes
Create one folder for the issued inputs and one log for open questions. Use a single technical contact to consolidate answers. When a revised schedule arrives, record what changed instead of silently replacing the earlier file.
Confirm the proposed and reference model scope, the expected report, included revisions and whether certification is part of the engagement. If inspection is required, identify the proposed inspector and site-access contact early. Modeling and certification have different handoffs; agreeing them now prevents gaps later.
Ready to share your project? Request 179D energy modeling services with the information you have today. We can identify remaining inputs before confirming the final scope.
Source notes
Technical references checked October 10, 2026. Confirm the rules that apply to the specific project.