LORHLAMENGINEERING, LLC
Pricing explained / Field notes

179D modeling cost.
Know what the fee covers.

A useful price comparison starts with the same scope. Here is how Lorhlam’s published fees work, what certification adds and which project details deserve a separate line in the quote.

What does 179D modeling cost at Lorhlam?

Our standard-scope modeling fee starts at $150 per building up to 50,000 square feet. Larger buildings follow the published area tiers, and buildings over 300,000 square feet require a custom quote. These are Lorhlam's service prices, not an industry average or an estimate of a tax deduction.

Modeling and certification are separate workstreams. The certification add-on is $450 per building in addition to the modeling fee. Field inspection, travel and additional verification are separately scoped. See the complete modeling fee table for all tiers.

A two-building example, with the arithmetic visible

Suppose a client requests modeling and certification for one 40,000-square-foot building and one 80,000-square-foot building. Each building uses its own modeling tier. The areas are not added together and treated as a single building.

Building A · 40,000 sq ft$150 modeling
Building B · 80,000 sq ft$275 modeling
Certification · 2 × $450$900 add-on
Illustrative service subtotal$1,325

Before inspection, travel and any additional agreed work.

The example assumes standard scope with complete, usable inputs. A portfolio agreement may establish different commercial terms; no volume discount is assumed here. Use the project fee estimator to explore individual building areas.

What can change the final quote?

Information quality

Complete drawing and system schedules give the engagement a clearer starting point. Missing dimensions, contradictory schedules or unresolved equipment selections can require extra coordination. Identify those gaps when requesting a proposal.

System complexity and scenarios

Multiple design alternatives create more work than one defined proposed design. Specify how many scenarios you need and whether the report must compare options. Complex systems also need a scope that reflects the required modeling approach.

Revisions and field work

Agree which revisions are included and how later changes are priced. Separately confirm the inspection provider, location, access arrangements and travel. Lorhlam's preferred client-PE arrangement and alternatives are described on the certification page.

Ask for comparable proposals

Give each provider the same building list, areas, dates and drawing set. Ask for a breakdown of modeling, certification and inspection-related charges. Confirm the final report, included revisions and responsibility for missing inputs.

A lower headline price can describe a smaller engagement. Compare what your team will receive and what remains your responsibility before choosing. The provider-selection guide offers six practical questions for that conversation.

To request a Lorhlam quote, share the available project documents and identify the service you need. We confirm scope and fees before work begins.

Your next step

Put your project
in focus.

Share your location, building area and available documentation. We will confirm the scope and fees before work begins.

Discuss Your Project
179D eligibility note

179D eligibility depends on project dates and applicable requirements. The deduction is terminated for property whose construction begins after June 30, 2026. Contact us to assess your project’s engineering scope and eligibility considerations. IRS guidance ↗