1. Define the assignment before opening the model
Start with the question the analysis must answer. Is your team evaluating a proposed design, documenting an installed project, or preparing the engineering work for certification? Record that purpose alongside the building location, modeled area and available project dates.
Agree the report format, revision allowance and responsibilities for unresolved inputs. If the building has several drawing revisions, identify the issued set before work begins. A short scope statement is the connection between the commercial proposal and the modeler's day-to-day decisions.
Construction start and placed-in-service dates should be recorded separately. IRS guidance ends availability for property whose construction begins after June 30, 2026. Earlier construction alone does not establish qualification. IRS Form 7205 instructions ↗
2. Translate the drawings into usable geometry
The plan provides the building's shape, but a useful analysis also needs its orientation, heights, openings and space uses. Grouping spaces into thermal zones turns those architectural details into a model that can represent different operating conditions.
For the Lorhlam workflow, the team prepares the 2D plan and zoning, then develops the eQUEST geometry. This is an opportunity to reconcile the area in the quote with the area shown in the issued plans. Flag unclear dimensions, additions and boundaries of conditioned space rather than silently choosing an interpretation.
Keep a short input register: the value, where it came from, its revision and whether it is confirmed. This makes later changes traceable. Our modeling document checklist helps organize the initial handoff.
3. Coordinate proposed and reference models
The proposed model represents the documented project systems; the reference supplies the required comparison basis. The analysis should account for applicable modeling rules rather than simply comparing the design with an arbitrary “typical building.”
Before treating a simulation run as a finished result, inspect the inputs and outputs together. A surprising change in consumption is a reason to check the associated schedule, equipment assignment or geometry. The objective is an explainable comparison, not a favorable number without an information trail.
Modeling software also needs to fit the assignment. Confirm the qualified version, reference standard and system capabilities using the DOE software list. Our eQUEST scope note explains why version selection matters.
4. Review the report and define the next handoff
A useful report lets another reviewer understand the basis of the analysis. It should identify the project, modeled scope, main assumptions and performance comparison, with the supporting detail agreed in the engagement.
Resolve open items deliberately. If the team supplies a revised equipment schedule, log the change and confirm whether the model and report need updating. If a value remains an assumption, make that status visible to the next reviewer.
Where certification is requested, agree the field-verification and qualified-review responsibilities. A completed simulation does not replace those activities. Read modeling versus certification to understand that boundary, or explore our 179D modeling service to request a defined scope.